Salzgitter Flachstahl GmbH |
Renewal of crane 13 cable tow |
HC Starck Tungsten GmbH |
Modernization H51 waste heat utilization |
SMS group GmbH |
Delivery of switchgear WTP extension |
SMS group GmbH |
Programming work on the cooling section |
GMT Society for Metallurgical |
Production of camera system for round rods |
HC Starck Tungsten GmbH |
Modernization of packing unit H51 |
ASM Automation GmbH |
Production of hydraulic switchgear EAF |
Chemitas GmbH Goslar |
Modernization of NaOH container BA311 |
BGH Edelstahl Freital GmbH |
Programming work automation SHO 1+2 |
BES Brandenburger Elektrostahlwerke GmbH |
Assembly work VNU system |
ILG Ilsenburger Grobblech GmbH |
Renewal of switchgear SH31 W2 WZ1 WZ2 |
F&S Feuerfestbau GmbH & Co. KG |
Delivery and commissioning of thyristor control |
Mannesmannrohren-Werk GmbH |
Implementation test function security RTA |
Lux Automation GmbH |
Component replacement of blast furnace A |
ILG Ilsenburger Grobblech GmbH |
Renewal of switchgear SV71 finishing |
Chemitas GmbH Goslar |
Electrical equipment cooling tower Hall West |
Pfeifer-Langen limited partnership Könnern |
Delivery of torque calculator LAC |
BES Brandenburger Elektrostahlwerke GmbH |
Assembly and dismantling work stretching system 4 |
H.C. Starck Infrastructure GmbH & Co. KG |
Extension of spiral balancing dryer |
Hasseröder Brewery GmbH |
Product-relevant measurements |
CG Drives & Automation Germany GmbH |
Milling of cutouts as required |
Klingenberger GmbH |
CNC machining of control cabinet doors |
BGH Edelstahl Freital GmbH |
Renewal of crane scales - cranes 223, 253 and 397 |
GIPA mbH Holzwickede |
Renewal of warehouse management IA and ZV Halle |
GIPA mbH Holzwickede |
Construction of a ground control for hot-dip galvanizing 2 SZFG |
BES Brandenburger Elektrostahlwerke GmbH |
Installation of a 60 kVA UPS system with sub-distribution |
BES Brandenburger Elektrostahlwerke GmbH |
Bund presses - extension of the hydraulic system |
BES Brandenburger Elektrostahlwerke GmbH |
Bund presses - separation of safety technology |
Chemitas GmbH Goslar |
Modernization of NaOH system pump yard 18 |
Likom Sachsen GmbH |
Production 3 pieces. Lighting distributions |
ASK GmbH Wolfenbüttel |
Manufacture and construction of switchgear, wiper test bench VW |
ILG Ilsenburger Grobblech GmbH |
Replacing the frequency converter on the cold side of the oven |
BES Brandenburger Elektrostahlwerke GmbH |
Billet furnace - modernization drives ejectors |
BES Brandenburger Elektrostahlwerke GmbH |
Billet furnace - conversion of safety controls |
Chemitas GmbH Goslar |
Modernization of consumption measurements U43 |
Hanomag Härtol Lohn Härterei GmbH |
Programming stage outsourcing KM02 & KM03 |
SMS group GmbH |
Setting up a flatness measurement for sheet metal |
Chemitas GmbH Goslar |
Modernization of consumption measurements U21 |
BES Brandenburger Elektrostahlwerke GmbH |
Manufacture and construction of a printer cabinet |
BES Brandenburger Elektrostahlwerke GmbH |
Secure hold of winding layer and driver |
Chemitas GmbH Goslar |
Modernization of HCl tank farm |
CG Drives & Automation Germany GmbH |
Milling of cutouts as required |
oddesse Pumpen- und Motorenfabrik GmbH |
Production of various engine monitoring devices po-msd |
Likom Sachsen GmbH |
Production of power distributors |
ASM Automation GmbH |
Production of switchgear EAF / LF |
Plakoma GmbH |
E-equipment rolling ring changing device |
HC Starck GmbH |
Installation of safety controls for bucket elevator |
Ilsenburger Grobblech GmbH |
Merger of media services |
BES Brandenburger Elektrostahlwerke GmbH |
Modernization of coil presses |
Rudolf Hensel GmbH Börnsen |
Modernization of test furnace |
Erndtebrück Fire Protection Testing and Technical Center |
Modernization of test furnace |
Technical University of Kaiserslautern |
Modernization of test furnace |
Ilsenburger Grobblech GmbH |
Modernization of the cooling circuit switchgear |
Ilsenburger Grobblech GmbH |
Modernization of pump station fire water supply |
BGH stainless steel works Freital |
Renewal of the cooling water supply to the ladle furnace |
Chemitas |
Well water system |
BES Brandenburger Elektrostahlwerke GmbH |
Modernization of billet furnace |
PAQUES WATERSYSTEMS BV, AB BALK |
Expansion of the Paulaner wastewater plant |
SRS Industrieofenbau GmbH |
Automation technology for roller hearth furnace Bainitic tempering |
Ilsenburger Grobblech GmbH |
Modernization of hydraulics Quarto |
Bochum Association for Transport Technology GmbH |
Modernization of the locomotive press |
BGH Edelstahlwerk Freital GmbH |
Extension of the arc furnace control after the cover has been modified
New water system ESU II
Renovation of the ladle furnace
Conversion of PFO switchgear
Automation level 1 for PMA |
H.C. Starck GmbH |
E-equipment for sodium hydroxide supply
Conversion of storage tank |
Ilsenburger Grobblech GmbH |
Modernization 800xA - control system
Merging wait media and technical gases |
Schmolz + Bickenbach |
Automation of the HDQT system |
Xella Technologie und Forschungsgesellschaft mbH |
E-equipment for combination test furnace |
BRAMMEN |
Temperature controlled warming box |
GMT |
Three-cross-roll-compact mill |
Ilsenburger Grobblech GmbH |
Warming box BFL 4
Water management for intensive cooling + roller tables
Electrical equipment for cold plate leveler |
KSC Khouzestan Steel Company |
Modernization of EAF Electric Arc Furnace No. 3 and No. 4 |
REFTHERM |
Fire test furnace |
Rolf Kuhn GmbH |
EMSR technology for combi test furnace |
Salzgitter AG |
Blast furnace: Plastic pellet / coal dust injection |
Stahl Judenburg GmbH |
E-equipment for Three-cross-roll-compact mill |
Titze |
Extension solar system |
Techn. Universität Kaiserslautern |
EMSR technology for combi test furnace |
Zuckerwerk Könnern |
LAC torque calculator with converter box |